Walkway Map Update History
The Walkway (WW) map was updated on Oct. 25, 2025
Bayonne – Bayonne Navy Pier, formerly known as MOTBY is now accessible on the south side. The western end of this Walkway ends at Rt 440. A walkway is planned going south along Rt 440 to connect with the existing WW that leads to Bayonne Golf Course.
Jersey City – The Walkway is under construction to connect Marin Blvd and the existing WW east of the marina.
Hoboken – The Walkway is under construction south of the Hoboken Cove Community Boathouse, to connect it the existing WW along Frank Sinatra Drive.
Weehawken – The section of the Walkway south of the Weehawken Pool is now changed from Under Construction to Planned.
Edgewater
- A Walkway is under construction by the former Hess Gas Tank at 615 River Road.
- Further north, the Walkway is under construction by Admiral’s Walk.
- At the northern most end of Edgewater, the planned Walkway by the Colony is changed to No-Access.
The Walkway (WW) map was updated on Aug 30, 2020
- Bayonne’s MOTBY (A Planned section changed to Under Construction)
- Jersey City’s Morris Canal Basin (A section that was Under Construction is Completed)
- Jersey City – The Ellipse (WW is now Completed around half of the pier)
- Weehawken Park inlet WW is now Under Construction)
- Weehawken – 1500 Harbor Blvd (accessible)
- Weehawken – Chart House (accessible)
- North Bergen – Roc Harbor (WW is Completed)
- Edgewater – Glass House (WW is Completed)
- Edgewater – De Novo, formerly Le Jardin (WW is completed)
The Walkway (WW) map was updated on May 6, 2017 to reflect small changes in Bayonne’s MOTBY; Jersey City’s Morris Canal Basin, Colgate Clock & Exchange Place; North Bergen’s Roc Harbor; and Edgewater’s IPark.
The Walkway (WW) map was updated on Sep. 2016 to reflect the following:
- The WW at Veterans Field Park, Edgewater is completed.
- The removal of the Hess oil tanks & its redevelopment in Edgewater changed “no access” to “planned”.
- Edgewater has completed a section of the WW at I-PARK, south of Main Street.
- The WW connecting North Bergen & Guttenberg is completed.
- Two sections in Jersey City by the Colgate Clock changed to “completed”.
- The WW at the western end of the Morris Canal by Liberty State Park is now completed to the footbridge.
- Along the Navy Pier in Bayonne, one short segment is completed and segments are “planned” to its east and west
The Walkway map was updated in 2013 to show minor changes and corrections in Edgewater’s I-PARK Development, City Place/Promenade and Veterans Field Park.
The Walkway map was updated on 6/6/12 to reflect completion of additional segments of the Walkway, including Weehawken Cove connecting Weehawken and Hoboken, Steven’s Institute in Hoboken and the Moorings condominiums in Edgewater. With these latest completions it is now possible to walk or bike from Goldman Sachs in Jersey City to the northern end of North Bergen, over seven miles. Several additional segments are under construction including The North Bergen/Guttenberg Park, Veteran’s Park in Jersey City, Veteran’s Park in Edgewater and I-Park in Edgewater(the old Unilever Research property). The Goal of a continuous Walkway from the Bayonne Bridge to the George Washington Bridge gets closer every year.